  • Aim:
    • enhanced reliability of water supply, increased production of water intake, qualitative improvement of fixed asserts.
    • The project includes construction of a water intake station of bucket type with a pumping unit of first ans second lifting, with capacity of 100.0 ths cub.m a day, chlorination unit and ultraviolet disinfection unit.
Volume of investment
  • RUR 1,652.5 m ($55.08 m) for the period 2011-2013.
Infrastructure available
  • The water intake is under the authority of JSC VODOKANAL.
  • The engineering and transport infrastructure meets the construction requirements.
  • There is a land site for construction.
Infrastructure required
  • Not required.
Cost of project
  • RUR 1,652.5 m for the period 2011-2013.
Implementation period
  • 2011 - 2013
IRR
  • Figures to be specified during the project's feasibility study
NPV
  • Figures to be specified during the project's feasibility study
Payback period
  • 20 years
Markets
  • Population and enterprises in the city of Yakutsk
Investor's involvement
  • 100% investor
Project detailedness
  • Design estimates by JSC Yakutagroproject, done in 2009 ш. 2697-СМ арх. № 68206.
  • Positive expert opinion on design estimates and engineering survey results № 14-1-3-10/33-03(1)-09 of 25.11.2009 by the Department of State Expertise of Design Estimates and Engineering Survey Results in Construction, Sakha Republic (Yakutia)
CEO of an organization implementing the project