Expansion and reconstruction of water intake station in the city of Yakutsk, Sakha Republic (Yakutia)
Location
- Yakutsk
Project initiator
Project characteristics
- Aim:
- enhanced reliability of water supply, increased production of water intake, qualitative improvement of fixed asserts.
- The project includes construction of a water intake station of bucket type with a pumping unit of first ans second lifting, with capacity of 100.0 ths cub.m a day, chlorination unit and ultraviolet disinfection unit.
Volume of investment
- RUR 1,652.5 m ($55.08 m) for the period 2011-2013.
Infrastructure available
- The water intake is under the authority of JSC VODOKANAL.
- The engineering and transport infrastructure meets the construction requirements.
- There is a land site for construction.
Infrastructure required
- Not required.
Cost of project
- RUR 1,652.5 m for the period 2011-2013.
Implementation period
- 2011 - 2013
IRR
- Figures to be specified during the project's feasibility study
NPV
- Figures to be specified during the project's feasibility study
Payback period
- 20 years
Markets
- Population and enterprises in the city of Yakutsk
Investor's involvement
- 100% investor
Project detailedness
- Design estimates by JSC Yakutagroproject, done in 2009 ш. 2697-СМ арх. № 68206.
- Positive expert opinion on design estimates and engineering survey results № 14-1-3-10/33-03(1)-09 of 25.11.2009 by the Department of State Expertise of Design Estimates and Engineering Survey Results in Construction, Sakha Republic (Yakutia)
CEO of an organization implementing the project
- Alexander Ivanovich FEDOTOV, General Director, OAO Republic's Investment Company (RIC)
- Alexander Anatolievich ANTONENKO, Minister of Housing, Communal Service and Power Supply of the Sakha Republic (Yakutia)
- Nikolai Vasilievich ZHESTKOV, Director General, OAO VODOKANAL